3rd Main Land Bridge to Be Shut Down For 3 Days

The Minister for Power, Works and Housing, Babatunde Fashola, has set the record straight on how long the Third Main Land Bridge Lagos would remain shut down.

Fashola disclosed on Monday, July 16, on Channels television morning programme ‘Sunrise Daily’, that the Third Main Land Bridge would only be shut down for three days, not 27 months as being speculated.

Read more